Email
Contact
Chat
Whatsapp
Contact Us
 > PRODUCTS > Stationary Crushers > Cone Crusher  >  ZYS Compound Cone Crusher
ZYS Compound Cone Crusher

ZYS Compound Cone Crusher

Capacity:27-1361t/h
Feed Opening Size:35-391mm
Application
mining, chemical industry, roads and bridges, construction and other fields
 
Material
It is suitable for fine crushing of various hard ores such as granite, river pebbles, iron ore, and non-ferrous metal ores.

Overview

Technical Data
Model Cavity Size Max Feeding Size(mm) Adjusting Range of Output Size(mm) Capacity (t/h) Motor Power (KW) Weight (t) Overall Dimension (mm)
ZYS36B Fine 85 9~22 45~91 75 14.5 2656×1746×2410
Coarse 150 13-38 59~163
Extra Coarse 152 25-38 118~163
ZYS36D Fine 35 3~13 27~90 15
Medium 65 5~16 36~100
Coarse 85 6~19 59~129
ZYS51B Fine 115 13~31 109~181 160 26.5 2958×2354×3156
Medium 178 16~38 132~253
Coarse 205 19~51 172~349
Extra Coarse 220 25~51 236~358
ZYS51D Fine 54 3~16 36~163 27
Medium 76 6~16 82~163
Coarse 89 8~25 109~227
Extra Coarse 113 16~25 209~236
ZYS66B Fine 178 16~38 181~327 250 51 3941×2954×3771
Medium 205 22~51 258~417
Coarse 228 25~64 299~635
Extra Coarse 313 38~64 431~645
ZYS66D Fine 60 5~13 90~209 52
Medium 76 6~19 136~281
Coarse 113 10~25 190~336
Extra Coarse 125 13~25 253~336
ZYS84B Fine 236 19~38 381~726 315 90 4613×3251×4732
Medium 284 25~51 608~998
Coarse 314 31~64 789~1270
Extra Coarse 391 38~64 880~1361
ZYS84D Fine 89 5~16 190~408 92
Medium 113 10~19 354~508
Coarse 151 13~25 454~599
Extra Coarse 172 16~25 508~653
Features
1.Secondary and fine crushing
The ZYS compound cone crusher is used after the primary crushing stage for further reduction of suitable rock and ore. Plan the crusher together with its feed preparation, screening and conveying equipment so that each stage matches the required products.

2.Match the cavity to the feed
Technical Data lists B and D model groups with different feed and discharge ranges; the cavity options vary by model. Match the selected row to the actual feed grading and required discharge setting. Include material hardness, abrasiveness and moisture in the selection review.

3.Setting and product grading
The discharge setting influences the material leaving the crushing chamber. Feed conditions, liner wear and the screening circuit also affect throughput and final grading. Use the relevant model data and agreed operating conditions when assessing capacity.

4.Inspection and maintenance access
Provide access to inspect the chamber, liners, lubrication and sealing components. Follow the operating manual for the supplied machine, including isolation before maintenance and the specified inspection intervals. Identify worn components before planning replacement work.

5.Parts and selection support
Send Dingbo the proposed model, feed information, target products and required throughput for a selection review. For replacement parts, provide the machine identification and component details so that the liner profile, assembly version and parts scope can be checked.
Working Principle
The motor drives the transmission and eccentric assembly, causing the moving cone to swing relative to the fixed concave. Material is compressed as the chamber narrows and moves downward as the gap opens, before leaving through the discharge opening. The operating setting and chamber geometry influence the crushing process; downstream screening establishes the required product fractions. Compare the cone crusher range and the GP single-cylinder hydraulic cone crusher using the same feed, product and plant-duty requirements.
Have a Project?
We would love to help you.

SERVICE

Dingbo is dedicated to being there for you for the life of your machine.
Projects Consulting
Projects Consulting
Projects Consulting
Dingbo process engineers are experts at suggesting the best equipment for existing operations and evaluating the solution most likely to improve the efficiency or capacity of your system. Based on our many years' experience on market development and project management, we provide specialized reconstruction services of production line for customers. Replacing old equipment with high-quality equipment greatly increases the output of production lines so that the customers can obtain huge return from relatively limited investment.
Solution Deisgn
Solution Deisgn
Solution Deisgn
Dingbo's Product Development Team has a vast knowledge and a wealth of expertise developing solutions that will benefit our customers in the best possible way. The team is constantly researching new and inventive solutions to ensure our equipment meets your needs. They look at ways to create safer handling and maintenance practices, simpler operating procedures and machines for increasing efficiency. Each piece of Dingbo equipment is designed to give you peace of mind by requiring minimal maintenance while giving your operation maximum profitability. We want to be sure our products do exactly what we say they will when they get to your operation.
Spare Parts Supply
Spare Parts Supply
Spare Parts Supply
Dingbo understands that when your equipment goes down, it doesn’t just cost you time, it costs you money. That’s why, when you choose Dingbo, you get more than great equipment, you get the industry’s best parts support. Dingbo has a good many warehouses of spare parts. High-quality spare parts ensure safe and stable operation of equipment. Rapid transport by air removes worry about production interruption loss.
Reconstruction Project
Reconstruction Project
Reconstruction Project
Dingbo process engineers are experts at suggesting the best equipment for existing operations and evaluating the solution most likely to improve the efficiency or capacity of your system. Based on our many years' experience on market development and project management, we provide specialized reconstruction services of production line for customers. Replacing old equipment with high-quality equipment greatly increases the output of production lines so that the customers can obtain huge return from relatively limited investment.
Installation Services
Installation Services
Installation Services
We provide complete installation services for customers regarding site leveling, foundation drawing inspection, construction progress, team planning, installation instruction and commissioning to ensure smooth operation of production lines. In addition, we provide appropriate trainings for customers to achieve their satisfaction. Thanks to many years' experience on on-site management, production line is not difficult for Dingbo.
Operation Training
Operation Training
Operation Training
Our Team are specialists in their field and have decades of application experience. Our customers all over the world also benefit from this expertise, because we are happy to pass our knowledge on to them in our Dingbo training sessions. With our wide range of training programs on applications, operation, and technology, we train you and your employees to use your Dingbo machines effectively and profitably.

REQUEST A QUOTE

Products:
Project Location:
Name:
Email:
Whatsapp:
Tel:
Please call me back
Company:
More Specifics: