YGM High-pressure Suspension Mill

Capacity:0.5-20t/h
Max. Input Size:30mm
Min. Output Size:30 - 425 mesh
Application
It can be used in mining, building materials, chemical industry, metallurgy and other industries.

Material
Limestone, calcite, barite, dolomite, potassium feldspar, bentonite, medical stone, rock phosphate, manganese ore, iron ore, quartz, active carbon, carbon black, ceramic, coal, etc.

Overview

Technical Data
Model Roller Ring
Feeding
Size (mm)
Finished
Size (mm)
Motor
Power (KW)
Capacity
(t/h)
Overall
Dimension (mm)
Quantity
(piece)
Diameter
(mm)
Height
(mm)
Inner
Diameter
(mm)
Height
(mm)
YGM7815 3 260 150 780 150 15 0.613-0.033 18.5 1-3 4300*3500*5100
YGM9517 4 310 170 950 170 25 0.613-0.033 37 2.1-5.6 7100*5900*7900
YGM4121 5 410 210 1280 210 30 0.613-0.033 75 2.8-10.5 9200*7250*9700
MTM160 6 440 270 1600 270 35 0.613-0.033 132 5-20 95500*8500*83500
MTM175 5 520 280 1750 280 40 0.6-0.045 160 13-25 12275*9555*9916
Features
1. Size of final product can be 0.613mm (30mesh) –0.033mm (425mesh). Some can reach the fineness of 0.013mm (1000 mesh).
2. Compared with other mills its capacity increases by 10%-20% under the same power condition and compression force of rollers to material improve 800-1200kgf under the force of high-pressure spring.
3. High Pressure Suspension Mill meets the requirement of national dust-dump standard..
4. The separator can be adjusted very easily..
5. The curved surface shovel with split design, only the blade to be replaced during maintenance, thus the shovel has long service life.
6. The multi-class seals are adopted to keep the grinding equipment tightly closed.
Working Principle
When working, under the action of high-pressure spring and centrifugal force, the grinding roller rolls close to the grinding ring, and the shovel scoops up the material and sends it between the grinding rollers and the grinding ring, and the grinding rollers roll with the grinding ring to achieve the purpose of grinding and crushing. After the material is ground, the powder will be separated by the classifier with the circulating air of the blower. The coarse powder will fall back to the grinding chamber for regrinding, and the qualified powder with airflow will enter the cyclone powder collector and be collected, and finally be discharged through a duct as finished products.
Have a Project?
We would love to help you.

SERVICE

Dingbo is dedicated to being there for you for the life of your machine.
Projects Consulting
Projects Consulting
Dingbo process engineers are experts at suggesting the best equipment for existing operations and evaluating the solution most likely to improve the efficiency or capacity of your system. Based on our many years' experience on market development and project management, we provide specialized reconstruction services of production line for customers. Replacing old equipment with high-quality equipment greatly increases the output of production lines so that the customers can obtain huge return from relatively limited investment.
Solution Deisgn
Solution Deisgn
Dingbo's Product Development Team has a vast knowledge and a wealth of expertise developing solutions that will benefit our customers in the best possible way. The team is constantly researching new and inventive solutions to ensure our equipment meets your needs. They look at ways to create safer handling and maintenance practices, simpler operating procedures and machines for increasing efficiency. Each piece of Dingbo equipment is designed to give you peace of mind by requiring minimal maintenance while giving your operation maximum profitability. We want to be sure our products do exactly what we say they will when they get to your operation.
Spare Parts Supply
Spare Parts Supply
Dingbo understands that when your equipment goes down, it doesn’t just cost you time, it costs you money. That’s why, when you choose Dingbo, you get more than great equipment, you get the industry’s best parts support. Dingbo has a good many warehouses of spare parts. High-quality spare parts ensure safe and stable operation of equipment. Rapid transport by air removes worry about production interruption loss.
Reconstruction Project
Reconstruction Project
Dingbo process engineers are experts at suggesting the best equipment for existing operations and evaluating the solution most likely to improve the efficiency or capacity of your system. Based on our many years' experience on market development and project management, we provide specialized reconstruction services of production line for customers. Replacing old equipment with high-quality equipment greatly increases the output of production lines so that the customers can obtain huge return from relatively limited investment.
Installation Services
Installation Services
We provide complete installation services for customers regarding site leveling, foundation drawing inspection, construction progress, team planning, installation instruction and commissioning to ensure smooth operation of production lines. In addition, we provide appropriate trainings for customers to achieve their satisfaction. Thanks to many years' experience on on-site management, production line is not difficult for Dingbo.
Operation Training
Operation Training
Our Team are specialists in their field and have decades of application experience. Our customers all over the world also benefit from this expertise, because we are happy to pass our knowledge on to them in our Dingbo training sessions. With our wide range of training programs on applications, operation, and technology, we train you and your employees to use your Dingbo machines effectively and profitably.

REQUEST A QUOTE

Products:
Project Location:
Name:
Email:
Whatsapp:
Tel:
Please call me back
Company:
More Specifics: