 > RESOURCES > NEWS  >  How to configure the main equipment of 500t/h limestone crushing production line?

How to configure the main equipment of 500t/h limestone crushing production line?

Limestone is a very common raw material for building materials. The main mineral component of limestone is calcite. Mineral particles and crystal structures are few, the surface is smooth and the particles are small. The colors are black, gray, white, yellow and brown. Limestone is widely used as a building material and is an important raw material for many industries. Limestone can be processed directly into stone for use in building materials.

This is a brief introduction to the line configuration at 500 tons per hour.



For a properly sized raw material warehouse, its output of 500 tons requires about 12 vehicles per hour, and this raw material warehouse needs to transport 2 raw materials and will produce continuously.
Vibrating feeder, which is usually equipped with a 6 m long and 1 m 3 wide inverter rod feeder, which can remove the soil and pre-screen.

Jaw crusher handles 500-600 tons of models, generally choose 1100*1200 jaw crusher, or 950*1250 jaw crusher



Limestone is soft and generally crushed as a medium, fine crushing operation. When choosing to produce 500 tons, two PFQ1315 will be used as the crushing material equipment, and you can also choose 1520.
The shaker can be selected from 3 sets of 2760 for inspection screening and completion screening.
Belt conveyor is to connect multiple belts and set up a production line.

At present, the basic situation of limestone production line configuration is like this, and more production line schemes can be configured according to the actual production requirements, and different numbers of sand making machines can be configured to further shape the product and increase the added value of the finished product. On the other hand, according to the needs of the market, crush high-quality organic sand to improve the efficiency of the production line.

Note: The incompletely crushed material in the jaw crusher needs to be returned to the jaw crusher for re-crushing, on the one hand, there is an opportunity for intermittent work, which reduces the power demand. On the other hand, it guarantees continuous and stable production and ensures the efficiency of the production line. It is proposed that 3,000 square meters of data should be stored in the transport library, and that the most important environmental protection measures should be carried out after the construction of the main line of the production line. If a drying process is used, the entire package will be evacuated. If a wet process is used, all spray and sewage treatment systems will be used to ensure environmental protection.